Located within a private family-owned estate, Port Takola is being built in phases as the focal point of a low-rise resort with residences, a hotel and a nature trail. Over time, it will expand to offer 260 berths.

For phase one, Marinetek supplied 225 meters of 4 meter-wide pontoons for alongside and stern-to mooring system for up to 50 vessels of 12–40 meters in length. Boaters have access to a café, good sanitary facilites, fuel dock, a 12 meter-wide slipway with 38 tons hydralic trailer boat lift and increasing number of yachting-related businesses. Krabi International Airport is nearby.

Although close to the busy tourist attractions of Ao Nang and Phang Nga Bay, Port Takola is sheltered and green set within unspoiled landscape.

Capacity

260 berths

Year

2016 (phase 1)

Customer

Gangadhara Company Ltd

Delivered by

Marinetek SEA

Products

Heavy Duty and All-concrete pontoons